• 九游会(j9)

    关于九游会(j9)

    u型玻璃幕墙安装方法

    2019-04-11 13:40

    u型玻璃幕墙安装如下:
    第一:放线,找预埋件,
    第二:开主骨料,装主骨料,
    第三:装横料,
    第四:装玻璃,
    第五:打玻璃胶。

    wKhQwFd7oX6EJ3QDAAAAAFaOcwc242[1].png


    The U-shaped glass curtain wall is installed as follows:
    Number one: put the wire out and find the buried parts.
    Second: open the main aggregate, load the main aggregate,
    The third is to load horizontal materials.
    Fourth, install glass.
    Fifth: hit the glass glue.